Breadcrumbs
- You are here:
- Home
- Forums
- EOC Related
- Suggestion Box
- control quadrant AD
×
This is the optional category header for the Suggestion Box.
control quadrant AD
- Matt Gunsch
- Offline
Less
More
- Posts: 454
11 Aug 2020 10:11 #1
by Matt Gunsch
A&P, IA, PPSEL
too many years GA and Warbird Maint
Check out the Ercoupe Discussion group on facebook
Replied by Matt Gunsch on topic control quadrant AD
July 2019, page 5
A&P, IA, PPSEL
too many years GA and Warbird Maint
Check out the Ercoupe Discussion group on facebook
Please Log in or Create an account to join the conversation.
- Larry Snyder
- Offline
Less
More
- Posts: 708
27 Jul 2020 21:12 #2
by Larry Snyder
Replied by Larry Snyder on topic control quadrant AD
We printed a picture in the Coupe Capers if the quadrants, but I can’t remember when. I think most planes have had the Quadrant replaced.
Please Log in or Create an account to join the conversation.
- William Stilley
- Topic Author
27 Jul 2020 20:18 #3
by William Stilley
control quadrant AD was created by William Stilley
AD 54-26-02 requires removing and inspecting the quadrant control cables for broken strands every hundred hours, unless you have an approved quadrant (met-co-aire 514 rev A or Erco 152137. My coupe sn 4742 has the met-co-air part and my other coupe sn 5077 has the Erco 152137. Both are original factory installed parts, so I think Erco knew about the problem and fixed it on later production aircraft but did not document it, although someone later updated the part number in the parts manual. Complying with the AD is not easy with the fuel tank and instrument panel in place. I think most log book entries are just pencil whipped or at best felt for broken strands by hand, but that does not comply with the AD.
Please Log in or Create an account to join the conversation.
Time to create page: 0.137 seconds